MINISTRY OF INDUSTRY AND TRADE |
SOCIALIST REPUBLIC OF VIETNAM |
|
No. 4274/QD-BCT |
Hanoi, November 14, 2018 |
DECISION
APPROVING ELECTRICITY PLANNING OF HAI PHONG CITY DURING 2016 – 2025 WITH AN ORIENTATION TOWARDS 2035 – PLANNING FOR 110 KV SYSTEM
MINISTER OF INDUSTRY AND TRADE
Pursuant to the Law on Electricity dated December 03, 2004 and the Law dated November 20, 2012 on amendments to the Law on Electricity;
Pursuant to the Government's Decree No. 137/2013/NĐ-CP dated October 21, 2013 elaborating the Law on Electricity and the Law on amendments to the Law on Electricity;
Pursuant to the Government's Decree No. 98/2017/NĐ-CP dated August 18, 2017 on functions, tasks, entitlements and organizational structure of the Ministry of Industry and Trade;
Pursuant to Circular No. 43/2013/TT-BCT dated December 31, 2013 on procedures for formulating , approving and revising electricity planning;
In consideration of request of the People’s Committee of Hai Phong city in document No. 112/TTr-UBND dated August 14, 2018; Document No. 3058/EVNNPT-KH dated September 04, 2018 of National Power Transmission Corporation, document No. 3725/EVNNPC-KH+KT+ĐT dated September 7, 2019 of Northern Power Corporation; Official Dispatch No. 6512/UBND-CT dated October 11, 2019 of the People’s Committee of Hai Phong city and document No. 1456/VNL-P8 dated October 03, 2019 of Institute of Energy enclosed with documents about revisions to the Scheme of October 2018;
At the request of Director of Electricity and Renewable Energy Authority.
DECIDES:
Article 1. Approving electricity planning of Hai Phong city during 2016 – 2025 with an orientation towards 2035 – Planning for 110 kV system
1. Development orientations
a) General orientations
- Development the transmission and distribution grid together with socio-economic development in each area and sub-area therein, ensure increasing quality and reliability of electricity.
- Ensure that the development of the transmission grid matches that of power plants in order to achieve overall efficiency of the national and local electricity systems; suitable for the electricity industry development strategy, electricity planning and other planning of the area and sub-areas therein.
- Build transmission lines suitable for long-term development. Ensure the grid meets of N-1 standards for reliability, the structure of the grid ensures high flexibility of management and operation. Carry out modernization and undergrounding at tourist attractions, industrial parks and urban areas in the city; minimize negative effects on the landscape and the environment. Improve stability, reliability of power supply and minimize power loss. Ensure effective and economic use of electricity; attract investment in projects that have modern and energy-saving technologies.
- Improve power supply reliability; apply technological advances and smart grids in grid operation: (i) develop and complete SCADA system; (ii) Organize remote control centers; build unmanned substations; (iii) Develop electronic meters and a system for remote collection of power consumption data; (iv) Build a smart grid system that facilitates interaction between the supplier and clients; (v) Apply advanced technologies such as: large-scale monitoring system, transmission line temperature monitoring system, system for fault detection, live-line working of electrical and compensating devices.
- Medium-voltage (MV) grid of the city is 22 kV. The 10 kV grid will be upgraded to 22 kV by 2020. During 2021 - 2025, the 35 kV grid will be used in Do Son, Hong Bang, Kien An district; 22 kV grid will be used in Kien Thuy and An Duong district. The 35 kV grid in other areas will be changed to 22 kV in later periods. Build underground cable systems in urban districts, towns of suburban districts, new residential areas, industrial parks, etc.; gradually replacing existing overhead lines in urban districts and towns of suburban districts with underground cables to preserve urban landscape.
b) Criteria for development of 220 kV and 110 kV grids
- Structure: the design of 220 kV and 110 kV grids shall ensure reliability and quality of electricity throughout their normal operation and in case of separate faults according to applicable regulations. The 220 kV and 110 kV grids shall ensure backups for development during next periods.
- 220 kV and 110 kV lines:
+ The design of 220 kV and 110 kV grids shall ensure that each 220 kV or 110 kV substation is supplied from at least 02 power sources (possibly from 2 busbar sections of the same power plant or a 500 kV or 220 kV substation)
+ 110 kV substations are continuously connected to ensure flexibility; the 110 kV grid may be run open-circuited to reduce short-circuit current.
+ Consider using compact poles for 220 kV and 110 kV lines or use underground 220 kV cables in downtown areas of cities of Class II or above to preserve urban landscape and meet power supply safety standards.
+ Cross-sectional area of cables: for overhead 220 kV lines, use multiple-phrase cables that with a cross-sectional area of ≥ 600 mm2 with preparation for next periods; use cables with a cross-sectional area of ≥ 300 mm2 for 110 kV lines. The cross-sectional area of underground cables shall satisfy the same standards for overhead cables.
- 220 kV and 110 kV substations:
+ Each 220 kV or 110 kV substation shall have 2 – 4 transformers. The capacity of the transformers shall satisfy N-1 standards in the heaviest load scenario of the local grid.
+ The busbar diagram on the 220 kV and 110 kV side of a 220 kV substation shall ensure flexibility and can be divided into at least 2 sections without reducing local power supply reliability.
+ 220 kV and 110 kV shall have adequate land area for installation of reactive power compensation devices or Flexible AC transmission system (FACTS).
+ Transformer power rating: use transformers with power rating of ≥ 220 MVA for the voltage of 220 kV; 25 MVA, 40 MVA, 63 MVA for the voltage of 110 kV; the power ratings of transformers at clients’ load stations may vary according to the load. The transformer power rating shall be suitable for local load density.+ Radial 22 kV networks shall be used for assistance in power supply between 110 kV substations.
c) Criteria for development of medium voltage grids
- Grid structure:
+ In urban districts, new urban areas, towns and important loads, the grid shall have radial and open-circuited structure; in rural areas, the grid shall have linear structure.
+ Radial medium voltage networks will carry 60% - 70% of the maximum load during normal operation.
- Cross-sectional area of cables:
+ In urban areas, new urban areas, tourist attractions, industrial parks: Main lines: use underground or overhead XPLE cables with a cross-sectional area of ≥ 240 mm2 or overhead insulated aluminum conductor steel-reinforced (ACSR) cables with a cross-sectional area of ≥ 185 mm2; branches: use XPLE cables with a cross-sectional area of ≥ 240 mm2 or insulated ACSR cables with a cross-sectional area of ≥ 95 mm2.
+ In suburban areas and rural areas: Main lines: ACSR cables with a cross-sectional area of ≥ 185 mm2; Main branches for 3-phase power supply in communes and neighborhood: ACSR cables with a cross-sectional area of ≥ 70 mm2.
- Distribution transformer ratings:
+ In urban districts, new urban areas, towns: use 3-phase transformers with a rating of at least 400 kVA;
+ In rural areas: use 3-phase transformers with a rating of 250 - 560 kVA;
+ Special substations shall be designed according to the clients’ load.
2. Development targets
a) Synchronously develop the transmission grid and distribution grid within Hai Phong city to achieve GRDP growth of 13,5% per year during 2016 – 2020, 13% per year during 2021 - 2025, 12,5% during 2026 - 2030, 11% per year during 2031 – 2035. Power demands in the years:
- 2020:
Maximum power Pmax = 1.348 MW, commercial production = 7.118 million kWh. Annual commercial production growth rate during 2016-2020 is 13,5% per year, including: Industry – Construction: 16,5%; Agriculture – Forestry - Aquaculture: 24,4%; Commerce – Services: 18,6%; Administration – Domestic use: 8%; Other activities: 10,9%. Commercial production per capita: 3.422 kWh per person per year.
- 2025:
Maximum power Pmax = 2.112 MW, commercial production = 11.241 million kWh. Annual commercial production growth rate during 2021-2025 is 9,6 % per year, including: Industry – Construction: 10,4%; Agriculture – Forestry - Aquaculture: 12,9%; Commerce – Services: 14,1%; Administration – Domestic use: 7%; Other activities: 8%. Commercial production per capita: 5.103 kWh per person per year.
- 2030: Maximum power Pmax = 2.986 MW, commercial production = 16,05 billion kWh. Annual commercial production growth rate during 2026- 2030 is 7,4% per year, including: Industry – Construction: 7,1%; Agriculture – Forestry - Aquaculture: 8,3%; Commerce – Services: 12,6%; Administration – Domestic use: 6,6%; Other activities: 6,8%. Commercial production per capita: 6.881 kWh per person per year.
- 2035: Maximum power Pmax = 3.989 MW, commercial production = 21,57 billion kWh. Annual commercial production growth rate during 2031 – 2035 is 6,1% per year, including: Industry – Construction: 5,4 %; Agriculture – Forestry - Aquaculture: 5,8%; Commerce – Services: 11%; Administration – Domestic use: 6,1%; Other activities: 5,8%. Commercial production per capita: 8.736 kWh per person per year.
Detailed power demands of load components are provided in Appendix 1 hereof.
b) Ensure safe and reliable power supply to serve economic development and social security.
c) Establish plans for connection of power plants in the city to the national electricity system; ensure reasonable use of power sources and stability of local electricity systems.
3. Grid development planning
Scales and schedules of construction of lines and substations over different periods:
a) 220 kV grid:
- 2018-2020:
+ Substations: Build 3 new 220 kV substations with a total power rating of 750 MVA; Renovate and upgrade 2 existing 220/110 kV substations with a total increase in power rating of 375 MVA.
+ Power lines: Build new 220 kV lines with a total length of 20 km to connect new 220 kV substations to the system; Renovate 72 km of the 220 kV line.
- 2021-2025:
+ Substations: Build 1 new 220 kV substation with a total power rating of 250 MVA; Renovate and upgrade 4 existing 220 kV substations with a total increase in power rating of 875 MVA.
+ Power lines: Build 4 new 220 kV lines with a total length of 73 km.
- 2026-2030:
+ Substations: Build 3 new 220 kV substations with a total power rating of 750 MVA; Renovate and upgrade 3 existing 220 kV substations with a total increase in power rating of 750 MVA.
+ Power lines: Build 6 new 220 kV lines with a total length of 170 km.
- 2031-2035:
+ Substations: Renovate and upgrade 7 existing substations with a total increase in power rating of 1.625 MVA.
b) 110 kV grid:
- 2018-2020:
+ Substations: Build 14 new 110 kV substation with a total power rating of 817 MVA; Renovate and upgrade 12 existing 110 kV substations with a total increase in power rating of 582 MVA.
+ Power lines: Build 29 new 110 kV lines with a total length of 253 km. Renovate 11 existing 110 kV lines with a total length of 191 km.
- 2021-2025:
+ Substations: Build 15 new 110 kV substations with a total power rating of 871 MVA; Renovate and upgrade 16 existing 110 kV substations with a total increase in power rating of 901 MVA.
+ Power lines: Build 17 new 110 kV lines with a total length of 171,4 km. Increase the gauges of 2 existing 110 kV lines with a total length of 38 km.
- 2026-2030:
+ Substations: Build 15 new 110 kV substations with a total power rating of 792 MVA; Renovate and upgrade 19 existing 110 kV substations with a total increase in power rating of 887 MVA.
+ Power lines: Build 22 new 110 kV lines with a total length of 156,4 km.
- 2031-2035:
+ Substations: Build 5 new 110 kV substations with a total power rating of 277 MVA; Renovate and upgrade 26 existing 110 kV substations with a total increase in power rating of 1.211 MVA.
+ Power lines: Build 7 new 110 kV lines with a total length of 38 km. Renovate and extend 2 existing 110 kV lines with a total length of 24 km.
Appendix 2 contains the list of 220 kV and 110 kV power lines and substations to be put into operation for the period 2018-2025; Appendix 3 for the period 2026-2035; detailed connection diagram is provided in drawing D864-HP-02 enclosed the planning documents.
c) MV grid for 2018-2025 period:
- Substations:
+ Build 1.884 new 35/0,4 kV, 22/0,4 kV, 35(22)/0,4 kV distribution substations with a total capacity of 1.984.700 kVA;
+ Upgrade 540 existing 22/0,4 kV, 35/0,4 kV substations with a total increase in capacity of 105.100 kVA; increase the voltage of 937 existing substations with a total capacity of 453.900 kVA being upgraded to 22 kV, 35 kV.
- Power lines:
+ Build new underground 35 kV, 22 kV cables with a total length of 871 km;
+ Build new overhead 22 kV, 35 kV cables with a total length of 410 km;
+ Put the MV grid underground; increase the wire gauge and change the voltage from 35 kV to 22 kV: total length of 434 of 22 kV and 35 kV lines.
d) Low-voltage (LV) grid for 2018-2025 period:
- Build 1.128 km of new 0,4 kV lines;
- Renovate 246 km of LV lines;
- Install 59.408 new electricity meters.
The MV and LV grids shall be specified in the detailed plan for medium-voltage and low-voltage grids after 110 kV substations (Part II) of electricity planning of Hai Phong city during 2016 – 2025 with an orientation towards 2035.
e) Renewable energy:
- By 2025, build 10 MW of solar power sources and 20 MW or wind power sources in Dinh Vu Industrial Park and Nam Dinh Vu 2 Industrial Park. Carry out research into development of grid-tied solar power sources with a capacity of about 5 MW in Dinh Vu Industrial Park, 20 MW in VSIP Hai Phong Industrial Park, 10 MW in Nam Cau Kien Industrial Park; build 3 grid-tied waste-to-energy plants with a capacity of about 5 MW in Tran Duong Waste Treatment Facility (Vinh Bao district); 3 MW in Gia Minh Solid Waste Treatment Complex (Thuy Nguyen district); 2 MW in Hai An Solid Waste Treatment Complex (Hai An district).
- On Bach Long Vy island: develop combined power supply sources from wind energy, solar energy, diesel and energy reserve; By 2020: install 2 diesel generators with a total capacity of 2 MVA, 1 MW of wind power, 500 kWp of solar power and 7,48 MWh of energy reserve. On Long Chau island: it is planned to supply power from an independent solar photovoltaic system array with a total capacity of 1,65 kW. Total investment in off-grid power supply systems in remote areas and islands during 2018-2025 is about VND 169 billion from central government budget or 85% ODA (15% from local government budget).
f) Investment capital:
During 2018 – 2025, total investment in building new and renovating existing grids from low-voltage to 220 kV is approximately VND 16.618 billion.
|
Including: |
+ 220 kV grid: |
2.774 billion VND; |
|
|
+ 110 kV grid: |
4.146 billion VND; |
|
|
+ MV grid: |
6.354 billion VND; |
|
|
+ LV grid: |
3.344 billion VND; |
Article 2. Organization of implementation
1. The People’s Committee of Hai Phong city shall announce the planning, reserve adequate land area for the works in the approved planning; instruct Department of Industry and Trade of Hai Phong city to prepare Part III of electricity planning for Hai Phong city during 2016-2025, with an orientation towards 2035: development of MV and LV grids after 110 kV substations.0}
2. EVN, National Power Transmission Corporation, Northern Power Corporation and investors shall cooperate with the authorities of Hai Phong city in organizing implementation of this document. During the process of investment in transmission and distribution grids, electricity supply units shall adhere to the approved grid structure, scale and voltage; comply with applicable regulations on electricity transmission system and distribution system.
3. Department of Industry and Trade of Hai Phong city shall request consultancy units to prepare the plan for completion of the planning documents in accordance with this Decision and send the completed documents to Electricity and Renewable Energy Authority – the Ministry of Industry and Trade, the People’s Committee of Hai Phong city, Department of Industry and Trade of Hai Phong city, EVN, National Power Transmission Corporation, North Power Corporation and Hai Phong Power Company.
4. Department of Industry and Trade of Hai Phong city shall monitor, inspect and administer the implementation of the approved planning. Managing, operating units, investors in power sources and power grids in Hai Phong city (Hai Phong Power Company, North Power Corporation, National Power Transmission Corporation, EVN, etc.) shall submit periodic reports on implementation of the master plan to Department of Industry and Trade of Hai Phong city.
Article 3. Chief of the Ministry Office, Director of Electricity and Renewable Energy Authority, the President of the People’s Committee of Hai Phong city, director of EVN, director of National Power Transmission Corporation, director of Hai Phong Power Company, director of North Power Corporation and relevant authorities are responsible for implementation of this Decision./.
|
|
MINISER |
APPENDIX 1
ELECTRICITY DEMAND IN HAI PHONG CITY DURING 2020-2025-2035
|
No. |
Purposes |
2015 |
2015 |
2015 |
2020 |
2020 |
2020 |
2025 |
2025 |
2025 |
2030 |
2030 |
2030 |
2035 |
2035 |
2035 |
Growth rate (% per year) |
Growth rate (% per year) |
Growth rate (% per year) |
Growth rate (% per year) |
||||||||||||||||||
|
|
|
P (MW) |
A (GWh) |
%A |
P (MW) |
A (GWh) |
%A |
P (MW) |
A (GWh) |
%A |
P (MW) |
A (GWh) |
%A |
P (MW) |
A (GWh) |
%A |
2016-2020 |
2021-2025 |
2026-2030 |
2031-2035 |
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
1 |
Industry, construction |
384,2 |
2021 |
53,4 |
821,4 |
4345 |
61,0 |
1.334,4 |
7.122 |
63,4 |
1.854,6 |
10.055 |
62,7 |
2.358,7 |
13.068 |
60,6 |
16,5 |
10,4 |
7,1 |
5,4 |
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
2 |
Agriculture – Forestry - Aquaculture |
5,7 |
9 |
0,2 |
16,4 |
26 |
0,4 |
26,5 |
48 |
0,4 |
39,4 |
72 |
0,4 |
52,2 |
95 |
0,4 |
24,5 |
12,9 |
8,3 |
5,8 |
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
3 |
Commerce, services |
61,3 |
166 |
4,4 |
136,5 |
389 |
5,5 |
239,5 |
751 |
6,7 |
425,6 |
1.357 |
8,5 |
704,6 |
2.287 |
10,6 |
18,6 |
14,1 |
12,6 |
11,0 |
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
4 |
Administration and domestic use |
514,8 |
1.449 |
38,3 |
731,0 |
2.126 |
29,9 |
1.017,2 |
2.981 |
26,5 |
1.380,0 |
4.094 |
25,5 |
1.830,1 |
5.499 |
25,5 |
8,0 |
7,0 |
6,6 |
6,1 |
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
5 |
Other purposes |
49,2 |
138 |
3,6 |
73,3 |
231 |
3,3 |
97,1 |
340 |
3,0 |
133,5 |
471 |
2,9 |
175,2 |
624 |
2,9 |
10,9 |
8,0 |
6,8 |
5,8 |
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
6 |
Total commercial production |
|
3.783 |
|
|
7.118 |
|
|
11.241 |
|
|
16.049 |
|
|
21.574 |
|
13,5 |
9,6 |
7,4 |
6,1 |
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
7 |
Loss |
|
4,50 |
|
|
4,0 |
|
|
3,7 |
|
|
3,5 |
|
|
3,3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
8 |
Total received power |
|
3.961 |
|
|
7.415 |
|
|
11.673 |
|
|
16.631 |
|
|
22.310 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
9 |
Pmax in the entire province (MW) |
720 |
720 |
720 |
1.348 |
1.348 |
1.348 |
2.112 |
2.112 |
2.112 |
2.986 |
2.986 |
2.986 |
3.989 |
3.989 |
3.989 |
13,4 |
9,4 |
7,2 |
6,0 |
|
|
||||||||||||||||
APPENDIX 2
LIST OF GRID WORKS TO BE BUILT DURING 2018-2025
Table 2.1. Scale and initiation time of 220-110 kV lines in Hai Phong city
|
No. |
Item |
Cross-sectional area |
Cross-sectional area |
Scale |
Scale |
Initiation year |
Notes |
|||||
|
|
|
Existing |
New or renovated |
Number of circuits |
Length |
|
|
|
|
|
||
|
I |
2018-2020 |
|
|
|
|
|
|
|
|
|
||
|
A |
220 kV lines |
|
|
|
|
|
|
|
|
|
||
|
|
New construction |
|
|
|
20 |
|
|
|
|
|
||
|
1 |
220 kV Thuy Nguyen substation |
|
2x400 |
4 |
0,5 |
2019 |
Connected to 2 circuits of 220 kV line of Hai Phong thermal power plant – Vat Cach |
|
|
|
||
|
2 |
220 kV An Lao substation (*) |
|
2x330 |
4 |
0,5 |
2020 |
Connected to 2 circuits of 220 kV line of Dong Hoa – Thai Binh |
|
|
|
||
|
3 |
Dinh Vu – Cat Hai (*) |
|
2x330 |
2 |
8 |
2020 |
|
|
|
|
||
|
|
Renovation, gauge increase |
|
|
|
|
|
|
|
|
|
||
|
1 |
Dong Hoa – Thai Binh |
500 |
2x330 |
2 |
36 |
2020 |
The section in Hai Phong city is 36 km in length |
|
|
|
||
|
B |
110 kV lines |
|
|
|
|
|
|
|
|
|
||
|
|
New construction |
|
|
|
252,7 |
|
|
|
|
|
||
|
1 |
LG Display - Nomura |
|
300 |
2 |
6 |
2018 |
|
|
|
|
||
|
2 |
Double-circuit branch at 110 kV Cuu Long substation |
|
300 |
1 |
0,1 |
2018 |
Connected to 1 circuit of 110 kV line of Vat Cach – An Lac |
|
|
|
||
|
3 |
220 kV Dinh Vu substation – Flat Glass |
|
500 |
1 |
3 |
2018 |
Underground cables |
|
|
|
||
|
4 |
Bridgestone - Flat Glass |
|
500 |
1 |
1 |
2018 |
Underground cables |
|
|
|
||
|
5 |
110 kV Kien Thuy substation branch |
|
300 |
2 |
4,5 |
2018 |
Connected to 1 circuit of 110 kV line of Dong Hoa – Do Son |
|
|
|
||
|
6 |
110 kV Quan Tru substation branch |
|
300 |
2 |
0,5 |
2018 |
Connected to 1 circuit of 110 kV line of Dong Hoa – Do Son |
|
|
|
||
|
7 |
110 kV Dong Bai substation branch |
|
300 |
2 |
0,1 |
2018 |
Connected to 1 circuit of 110 kV line of Cho Roc – Cat Hai |
|
|
|
||
|
8 |
110 kV An Lao 1 substation branch |
|
300 |
4 |
0,5 |
2018 |
Connected to 2 circuits of 110 kV line of Dong Hoa – Vinh Bao |
|
|
|
||
|
9 |
110 kV double-circuit line of Cho Roc – Cat Hai – Cat Ba |
|
300 |
1 |
44 |
2018 |
|
|
|
|
||
|
10 |
110 kV Luu Kiem substation branch |
|
300 |
2 |
6,6 |
2019 |
Connected to 1 circuit of 110 kV line of Trang Bach – 220 kV Thuy Nguyen substation |
|
|
|
||
|
11 |
110 kV double-circuit line of 220 kV Vat Cach substation - Nomura |
|
300 |
1 |
3 |
2019 |
|
|
|
|
||
|
12 |
2-circuit branch at 110 kV Nam Cau Kien substation |
|
300 |
1 |
0,5 |
2019 |
Connected to 1 circuit of 110 kV line of 220 kV Thuy Nguyen substation - An Lac |
|
|
|
||
|
13 |
Connection of 110 kV side of 220 kV Thuy Nguyen substation to 110 kV line of Thuy Nguyen 1 - Thuy Nguyen 2 |
|
300 |
4 |
1 |
2019 |
2 double-circuit line, connected to 2 circuits of 110 kV line of Ngu Lao – Thuy Nguyen 2 |
|
|
|
||
|
14 |
Connection of 110 kV side of 220 kV Thuy Nguyen substation to 110 kV line of Trang Bach – An Lac |
|
300 |
2 |
3,5 |
2019 |
Divide 110 kV line of Trang Bach – An Lac into two lines by 220 kV Thuy Nguyen substation |
|
|
|
||
|
15 |
Hai Phong Thermal Power Plant – Chinfon Cement |
|
300 |
2 |
4,4 |
2019 |
Convert the first part of 110 kV double-circuit line of Hai Phong Thermal Power Plant – Thuy Nguyen 1 to the branch at 110 kV Chinfon Cement substation into a 4-circuit line, 2 circuits of which are connected to Chinfon Cement, the other 2 circuits are connected to Thuy Nguyen 1 |
|
|
|
||
|
16 |
Connection of 110 kV side of 220 kV Thuy Nguyen substation to 110 kV line of Thep Viet Nhat (Vijagroup) – Thep Viet Y (VIS) |
|
300 |
2 |
7,2 |
2019 |
Convert a section of the 110 kV line of 220 kV Thuy Nguyen - Nam Cau Kien station to 110 kV Thep Viet Y station into a 4-circuit line, 2 circuits of which are connected to Thep Viet Y, the other 2 circuites are connected to Nam Cau Kien - An Lac |
|
|
|
||
|
17 |
110 kV Do Thi Xi Mang substation branch |
|
300 |
2 |
0,5 |
2019 |
Connected to 1 circuit of 110 kV line of Ha Ly branch |
|
|
|
||
|
18 |
110 kV Lien Khe Cement substation branch |
|
185 |
2 |
1,6 |
2019 |
Connected to 1 circuit of 110 kV line of Uong Bi – Chinfon Cement |
|
|
|
||
|
19 |
110 kV An Duong substation branch |
|
300 |
2 |
1 |
2019 |
Connected to 1 circuit of 110 kV line of Dong Hoa – An Lao 1 |
|
|
|
||
|
20 |
Branch connected to 110 kV substation of An Duong Industrial Park |
|
300 |
2 |
0,5 |
2019 |
Connected to 1 circuit of 110 kV line of Nomura - LG Display |
|
|
|
||
|
21 |
Dinh Vu Steel – Do Son Industrial Park |
|
300 |
2 |
20 |
2019 |
|
|
|
|
||
|
22 |
Double-circuit branch at 110 kV Posco substation |
|
300 |
1 |
0,1 |
2020 |
Connected to 1 circuit of 110 kV line of Vat Cach – An Lac, |
|
|
|
||
|
23 |
Thuy Nguyen - Bac Song Cam 2 |
|
400 |
2 |
7,5 |
2020 |
|
|
|
|
||
|
24 |
Branch at 110 kV Nam Dinh Vu 2 substation |
|
300 |
2 |
2,1 |
2020 |
Connected to 1 circuit of 110 kV line of Dinh Vu Steel – Do Son Industrial Park |
|
|
|
||
|
25 |
Branch at 110 kV Cau Rao substation |
|
300 |
4 |
1,5 |
2020 |
Connected to 2 circuits of 110 kV line of Dong Hoa – Dinh Vu |
|
|
|
||
|
26 |
Connection of 110 kV side of 220 kV An Lao substation to 110 kV line of Dong Hoa – Vinh Bao |
|
300 |
4 |
2 |
2020 |
2 double-circuit lines, connected to 2 circuits of 110 kV line of Dong Hoa – Vinh Bao |
|
|
|
||
|
27 |
110 kV line from 220 kV An Lao substation to the connection point of LG Display on Trang Due branch |
|
300 |
2 |
10 |
2020 |
Remove the branch at 110 kV LG Display substation from the branch at 110 kV Trang Due substation |
|
|
|
||
|
28 |
110 kV line from 220 kV An Lao substation to branch at 110 kV Tien Lang substation |
|
300 |
2 |
5,5 |
2020 |
Remove the branch at 110 kV Tien Lang substation from the branch at 110 kV line of An Lao – Vinh Bao |
|
|
|
||
|
29 |
Nam Dinh Vu 1 – Cat Hai |
|
400 |
2 |
9 |
2020 |
|
|
|
|
||
|
|
Renovation, gauge increase |
|
|
|
191,4 |
|
|
|
|
|
||
|
1 |
Trang Bach – Thuy Nguyen 2 – Nam Cau Kien – An Lac |
150 |
300 |
2 |
20 |
2018-2019 |
|
|
|
|
||
|
2 |
Vat Cach - Nomura |
240 |
300 |
1 |
3 |
2018 |
Increase the gauge of 110 kV single-circuit line of Vat Cach - Nomura |
|
|
|
||
|
3 |
Branch at 110 kV Trang Due substation |
240 |
300 |
2 |
3,6 |
2018 |
Convert T-connection into continuous connection |
|
|
|
||
|
4 |
Cho Roc – Cat Hai – Cat Ba |
185 |
300 |
1 |
44 |
2018 |
Convert 110 kV single-circuit line of Cho Roc – Cat Hai – Cat Ba |
|
|
|
||
|
5 |
Branch at 110 kV Ha Ly substation |
120 |
300 |
2 |
5 |
2019 |
Convert from single-circuit line into double-circuit line |
|
|
|
||
|
6 |
Branch at 110 kV Vinh Bao substation |
185 |
300 |
2 |
2 |
2019 |
Convert T-connection into continuous connection |
|
|
|
||
|
7 |
Hai Phong Thermal Power Plant – 220 kV Thuy Nguyen substation |
240 |
300 |
2 |
10 |
2020 |
Convert the 110 kV double-circuit line from Chinfon Cement branch to 220 kV Thuy Nguyen substation |
|
|
|
||
|
8 |
Renovation of the branch at 110 kV Cua Cam substation |
120 |
300 |
2 |
3,5 |
2020 |
Convert T-connection into continuous connection |
|
|
|
||
|
9 |
Branch at 110 kV Lach Tray substation |
185 |
300 |
2 |
1,6 |
2020 |
Convert T-connection into continuous connection |
|
|
|
||
|
10 |
Dong Hoa – Kien An – Do Son |
240 |
300 |
2 |
25 |
2020 |
|
|
|
|
||
|
11 |
Branch at 110 kV Do Son substation |
240 |
300 |
2 |
1,5 |
2020 |
|
|
|
|
||
|
II |
2021-2025 |
|
|
|
|
|
|
|
|
|
||
|
A |
220 kV lines |
|
|
|
|
|
|
|
|
|
||
|
I |
New construction |
|
|
|
73 |
|
|
|
|
|
||
|
1 |
Branch at 220 kV Duong Kinh substation |
|
500 |
4 |
0,5 |
2021 |
Connected to 2 circuits of 220 kV line of Dong Hoa – Dinh Vu |
|
|
|
||
|
2 |
500 kV Hai Phong substation – Gia Loc |
|
4x330 |
2 |
5,5 |
2023 |
The section in Hai Phong city is 5,5 km in length |
|
|
|
||
|
3 |
Hai Phong 3 & 4 Thermal Power Plants - Nam Hoa |
|
2x600 |
2 |
18 |
2025 |
Synchronize generating set 1 of Hai Phong 3 Thermal Power Plant |
|
|
|
||
|
4 |
Nam Hoa – Cat Hai |
|
2x330 |
2 |
12 |
2025 |
|
|
|
|
||
|
B |
110 kV lines |
|
|
|
|
|
|
|
|
|
||
|
|
New construction |
|
|
|
171,4 |
|
|
|
|
|
||
|
1 |
Dai Ban – 220 kV Vat Cach substation |
|
300 |
2 |
4,5 |
2021 |
|
|
|
|
||
|
2 |
Connection of 110 kV side of 220 kV Duong Kinh substation to 110 kV line of Kien An – Do Son |
|
300 |
4 |
2 |
2021 |
Connected to 2 circuits of 110 kV line of Kien An – Do Son |
|
|
|
||
|
3 |
Connection of 110 kV side of 220 kV Duong Kinh substation to 110 kV line of Dinh Vu Steel – Do Son Industrial Park |
|
300 |
4 |
3 |
2021 |
Connected to 2 circuits of 110 kV line of Dinh Vu Steel – Do Son Industrial Park |
|
|
|
||
|
4 |
Branch at 110 kV Ho Dong substation |
|
300 |
4 |
0,5 |
2021 |
Connected to 2 circuits of 110 kV line of Dong Hoa – Dinh Vu |
|
|
|
||
|
5 |
Connection of 110 kV side of 220 kV Duong Kinh substation to 110 kV line of Dong Hoa – Dinh Vu |
|
300 |
4 |
11 |
2021 |
Connected to 2 circuits of 110 kV line of Dong Hoa – Dinh Vu, between the connection point of 110 kV Lach Tray substation and the branch at 110 kV Cua Cam substation |
|
|
|
||
|
6 |
Branch at 110 kV substation of Cau Cuu Industrial Park |
|
300 |
2 |
0,5 |
2021 |
Connected to 1 circuit of 110 kV line of An Lao– Vinh Bao |
|
|
|
||
|
7 |
Tien Thang – Tien Lang |
|
300 |
2 |
7,6 |
2021 |
Connected to 1 circuit of 110 kV line of An Lao – Tien Lang |
|
|
|
||
|
8 |
Cat Hai – Lach Huyen Port |
|
400 |
2 |
5 |
2021 |
|
|
|
|
||
|
9 |
Hai Phong Thermal Power Plant - Bac Song Cam 1 |
|
400 |
2 |
10 |
2022 |
|
|
|
|
||
|
10 |
Vinh Bao – Tam Cuong |
|
300 |
2 |
7,8 |
2022 |
|
|
|
|
||
|
11 |
Branch at 110 kV Ben Rung substation |
|
400 |
2 |
1 |
2023 |
Connected to 1 circuit of 110 kV line between the 220 kV substation of Hai Phong Thermal Power Plant and Bac Song Cam 1 |
|
|
|
||
|
12 |
Branch at 110 kV Trang Cat substation |
|
300 |
4 |
0,5 |
2023 |
Connected to 2 circuits of 110 kV line of Duong Kinh - Dinh Vu Steel |
|
|
|
||
|
13 |
Branch at 110 kV Van Huong substation |
|
300 |
2 |
5 |
2024 |
Connected to 1 circuit of 110 kV line of Do Son – Do Son Industrial Park |
|
|
|
||
|
14 |
Branch at 110 kV auxiliary transformer substation of Hai Phong 3&4 thermal power plant |
|
185 |
2 |
1 |
2025 |
Connected to 1 circuit of 110 kV line of Trang Bach – Chinfon Cement |
|
|
|
||
|
15 |
Branch connected to 110 kV Nam Dinh Vu 1-2 substation |
|
400 |
2 |
1,8 |
2025 |
Connected to 1 circuit of 110 kV line of Dinh Vu – Nam Dinh Vu 1-2 |
|
|
|
||
|
16 |
220 kV An Lao substation – An Lao 2 |
|
300 |
2 |
6,5 |
2025 |
|
|
|
|
||
|
17 |
Branch at 110 kV Cat Hai 2 substation |
|
300 |
4 |
0,5 |
2025 |
Connected to 1 circuit of 110 kV line of Nam Hoa – Cat Hai |
|
|
|
||
|
|
Renovation, gauge increase |
|
|
|
38 |
|
|
|
|
|
||
|
1 |
A section of 110 kV line of Dong Hoa – connection point of the branch at 110 kV Ha Ly substation |
185 |
300 |
4 |
4 |
2022 |
Convert into a 4-circuit line, 2 circuits of which are connected to the 110 kV Do Thi Xi Mang substation and Ha Ly substation, the other 2 circuits are connected to An Lac |
|
|
|
||
|
2 |
Vat Cach – Posco – An Lact – Connection point of 110 kV Do Thi Xi Mang |
185 |
300 |
2 |
11 |
2023 |
|
|
|
|
||
(*) Revisions to the schedule for construction of the 220 kV line between the 220 kV An Lao substation and 220 kV Cat Hai substation will be specified in a separate scheme, which will be submitted to the Prime Minister for approval.
Table 2.2. New construction, renovation and upgrade of 220 kV and 110 kV substations in Hai Phong city during 2018-2020
|
No. |
Substation |
Transformer |
2017 |
2017 |
2018 |
2018 |
2019 |
2019 |
2020 |
2020 |
|||||||||
|
|
|
|
Capacity |
Voltage |
Capacity |
Voltage |
Capacity |
Voltage |
Capacity |
Voltage |
|
|
|
|
|||||
|
I |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
|||||||||
|
|
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
|||||||||
|
1 |
Thuy Nguyen |
AT1 |
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
An Lao (connected to 500 kV Hai Phong substation) (*) |
AT1 |
|
|
|
|
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
3 |
Cat Hai (*) |
AT1 |
|
|
|
|
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
|||||||||
|
1 |
Dong Hoa |
AT1 |
125 |
220/110 |
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
AT2 |
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
Duong Kinh |
AT1 |
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
AT2 |
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
II |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
|||||||||
|
|
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
|||||||||
|
1 |
Lien Khe Cement |
T1 |
|
|
|
|
30 |
110/6 |
|
|
|
|
|
|
|
|
|
|
|
|
2 |
Luu Kiem |
T1 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
3 |
Bac Song Cam 2 |
T1 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
4 |
An Duong Industrial Park |
T1 |
|
|
|
|
40 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
5 |
An Duong |
T1 |
|
|
|
|
40 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
6 |
Do Thi Xi Mang |
T1 |
|
|
|
|
40 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
7 |
Cau Rao |
T1 |
|
|
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
8 |
Flat Glass |
T1 |
|
|
25 |
110/10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
25 |
110/10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9 |
Nam Dinh Vu 2 |
T1 |
|
|
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
10 |
Quan Tru |
T1 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11 |
Kien Thuy |
T1 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12 |
An Lao 1 |
T1 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
13 |
Dong Bai |
T1 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
14 |
Cat Ba |
T1 |
|
|
25 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
25 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
|||||||||
|
1 |
Thuy Nguyen 2 |
T1 |
25 |
110/35/10 |
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
63 |
110/35/(22)10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
LG Display |
T1 |
63 |
110/22/10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
63 |
110/22/10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T3 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T4 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
3 |
Cua Cam |
T1 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
Cat Bi |
T1 |
40 |
110/22 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
Dinh Vu Steel (Thep Dinh Vu) |
T1 |
25 |
110/22/6 |
63 |
110/22/6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6 |
Dinh Vu (connected to 220 kV substation) |
T1 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
Bridgestone |
T1 |
20 |
110/6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
20 |
110/6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T3 |
|
|
|
|
|
|
10 |
110/6 |
|
|
|
|
|
|
|
|
|
|
8 |
Do Son |
T1 |
25 |
110/35/22 |
|
|
40 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
25 |
110/35/22 |
|
|
40 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
9 |
Do Son Industrial Park |
T1 |
25 |
110/22/10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
25 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
10 |
Tien Lang |
T1 |
25 |
110/35/22 |
|
|
40 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
25 |
110/35/22 |
|
|
|
|
40 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
11 |
Vinh Bao |
T1 |
25 |
110/35/(22)10 |
|
|
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
40 |
110/35/(22)10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12 |
Cat Hai |
T1 |
25 |
110/35/22 |
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
40 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
(*) Revisions to the schedule for construction of 220 kV An Lao substation and 220 kV Cat Hai substation will be specified in a separate scheme, which will be submitted to the Prime Minister for approval.
Table 2.3. New construction, renovation and upgrade of 220 kV and 110 kV substations in Hai Phong city during 2021-2025
|
No. |
Substation |
Transformer |
2020 |
2020 |
2021 |
2021 |
2022 |
2022 |
2023 |
2023 |
2024 |
2024 |
2025 |
2025 |
|||||||||||||||||
|
|
|
|
Capacity |
Voltage |
Capacity |
Voltage |
Capacity |
Voltage |
Capacity |
Voltage |
Capacity |
Voltage |
Capacity |
Voltage |
|
|
|
|
|
||||||||||||
|
I |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
|||||||||||||||||
|
|
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
|||||||||||||||||
|
1 |
Duong Kinh |
AT1 |
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
AT2 |
|
|
|
|
|
|
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
|||||||||||||||||
|
1 |
Hai Phong Thermal Power Plant |
AT1 |
125 |
220/110 |
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
AT2 |
125 |
220/110 |
|
|
|
|
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
2 |
Vat Cach |
AT1 |
125 |
220/110 |
|
|
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
AT2 |
250 |
220/110 |
|
|
|
|
|
|
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
3 |
An Lao (connected to 500 kV Hai Phong substation) |
AT1 |
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
AT2 |
|
|
|
|
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
II |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
|||||||||||||||||
|
|
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
New construction |
|
|
|
|
|||||||||||||||
|
1 |
Bac Song Cam 1 (VSIP) |
T1 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
2 |
Ben Rung |
T1 |
|
|
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
3 |
Hai Phong Thermal Power Plant 3&4 |
T1 |
|
|
|
|
|
|
|
|
|
|
50 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
4 |
Dai Ban |
T1 |
|
|
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
5 |
Ho Dong |
T1 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
6 |
Trang Cat |
T1 |
|
|
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
7 |
Nam Dinh Vu 1 - 2 |
T1 |
|
|
|
|
|
|
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
8 |
Duong Kinh (connected at 220 kV) |
T1 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
9 |
Van Huong |
T1 |
|
|
|
|
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
10 |
Can Cuu Industrial Park |
T1 |
|
|
25 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
11 |
An Lao 2 |
T1 |
|
|
|
|
|
|
|
|
|
|
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
12 |
Tien Thang 2 |
T1 |
|
|
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
13 |
Tam Cuong |
T1 |
|
|
|
|
40 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
14 |
Lach Huyen Port |
T1 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
15 |
Cat Hai 2 |
T1 |
|
|
|
|
|
|
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
Upgrade |
|||||||||||||||||
|
1 |
Thuy Nguyen 1 |
T1 |
63 |
110/35/22 (10) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T2 |
25 |
110/35/6 |
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
2 |
Nam Cau Kien |
T1 |
16 |
110/6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T2 |
|
|
40 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
3 |
Vietnam Italy Steel (VIS) |
T1 |
63 |
110/22/6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T2 |
63 |
110/22/6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T3 |
|
|
63 |
110/22/6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
4 |
Luu Kiem |
T1 |
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T2 |
|
|
|
|
|
|
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
5 |
Bac Song Cam 2 |
T1 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T2 |
|
|
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T3 |
|
|
|
|
|
|
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
6 |
Nomura Industrial Park |
T1 |
60 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T2 |
60 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T3 |
|
|
60 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
7 |
An Duong |
T1 |
40 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T2 |
|
|
|
|
|
|
|
|
40 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
8 |
An Lac |
T1 |
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T2 |
25 |
110/35/22 |
40 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T3 |
40 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
9 |
Do Thi Xi Mang |
T1 |
40 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T2 |
|
|
|
|
|
|
|
|
40 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
10 |
Lach Tray |
T1 |
40 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T2 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
11 |
Nam Dinh Vu 1 |
T1 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T2 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
12 |
Quan Tru |
T1 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T2 |
|
|
|
|
|
|
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
13 |
Kien Thuy |
T1 |
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T2 |
|
|
|
|
|
|
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
14 |
An Lao 1 |
T1 |
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T2 |
|
|
|
|
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
15 |
Cat Ba |
T1 |
25 |
110/35/22 |
|
|
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
T2 |
25 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
16 |
Lach Huyen Port |
T2 |
|
|
|
|
|
|
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|||||
Table 2.4. Volumn of new construction, renovation and upgrade of medium-voltage (MV) and low-voltage (LV) grids in Hai Phong city during 2018-2025
|
No. |
Item |
Unit |
Construction volumn |
Construction volumn |
|
|
|
|
|
2018-2020 |
2021-2025 |
|
|
1 |
Distribution substations |
|
|
|
|
|
a |
New construction |
station/kVA |
914 / 942200 |
970 / 1042500 |
|
|
+ |
Substations owned by electric utilities |
station/KVA |
498 / 173160 |
454 / 263060 |
|
|
+ |
Substations owned by clients |
station/KVA |
416 / 769040 |
516 / 779440 |
|
|
b |
Renovation |
station/KVA |
723 / 215.700 |
754 / 343.300 |
|
|
+ |
Substations owned by electric utilities |
station/KVA |
570 / 157.785 |
439 / 124.045 |
|
|
+ |
Substations owned by clients |
station/KVA |
153 / 57.915 |
315 / 219.255 |
|
|
2 |
MV lines |
|
|
|
|
|
a |
New construction |
km |
723 |
557 |
|
|
+ |
Underground |
km |
441 |
430 |
|
|
+ |
Overhead |
km |
282 |
128 |
|
|
b |
Renovation |
km |
351 |
83 |
|
|
+ |
Underground |
km |
103 |
50 |
|
|
+ |
Overhead |
km |
248 |
33 |
|
|
3 |
LV lines |
|
|
|
|
|
a |
New construction |
km |
662 |
466 |
|
|
+ |
Underground |
km |
212 |
155 |
|
|
+ |
Overhead |
km |
450 |
311 |
|
|
b |
Renovation |
km |
157 |
89 |
|
|
+ |
Underground |
km |
114 |
89 |
|
|
+ |
Overhead |
km |
43 |
|
|
|
4 |
Electricity meter |
pcs |
29464 |
29944 |
|
APPENDIX 3
LIST OF GRID WORKS TO BE BUILT DURING 2026-2035
Table 3.1. Construction of 220 kV and 110 kV transmission lines in Hai Phong city during 2026-2035
|
No. |
Item |
Cross-sectional area of conductor |
Cross-sectional area of conductor |
Scale |
Scale |
Description/Notes |
||||
|
|
|
Existing |
New or renovated |
Number of circuits |
Length |
|
|
|
|
|
|
I |
2026-2030 |
|
|
|
|
|
|
|
|
|
|
A |
220 kV lines |
|
|
|
|
|
|
|
|
|
|
|
New construction |
|
|
|
170 |
|
|
|
|
|
|
1 |
500 kV Hai Phong substation – Duong Kinh |
|
2x330 |
2 |
8 |
|
|
|
|
|
|
2 |
Hai Phong 3&4 Thermal Power Plant – Vat Cach |
|
2x600 |
2 |
21 |
Synchronize generating set 2 of Hai Phong 3 Thermal Power Plant (600 MW) |
|
|
|
|
|
3 |
Hai Phong 3&4 Thermal Power Plant – Dai Ban |
|
2x330 |
2 |
32 |
Synchronize generating set 2 of Hai Phong 3 Thermal Power Plant (600 MW) |
|
|
|
|
|
4 |
Tien Lang – An Lao |
|
2x330 |
2 |
14 |
|
|
|
|
|
|
5 |
Do Son – Duong Kinh |
|
2x330 |
2 |
8 |
|
|
|
|
|
|
6 |
Branch at 220 kV Dai Ban substation |
|
2x400 |
4 |
1 |
Connected to 2 circuits of 220 kV line of Dong Hoa – Hai Duong 2 |
|
|
|
|
|
|
110 kV lines |
|
|
|
|
|
|
|
|
|
|
|
New construction |
|
|
|
156.4 |
|
|
|
|
|
|
1 |
Branch at 110 kV Ky Son substation |
|
300 |
4 |
1.3 |
Connected to 2 circuits of 110 kV line of 220 kV Thuy Nguyen substation – Trang Bach |
|
|
|
|
|
2 |
Branch at 110 kV substation of Thuy Nguyen 2 Industrial Park (VSIP) |
|
300 |
2 |
1.5 |
Connected to 1 circuit of 110 kV line of 220 kV Thuy Nguyen substation – Hai Phong Thermal Power Plant |
|
|
|
|
|
3 |
Connection of 110 kV side of 220 kV Dai Ban substation to 110 kV line of LG Display – An Duong Industrial Park |
|
300 |
4 |
1.2 |
Connected to 2 circuits of 110 kV line of LG Display – An Duong Industrial Park |
|
|
|
|
|
4 |
Branch at 110 kV Nui Deo substation |
|
300 |
2 |
1 |
Connected to 1 circuit of 110 kV line of Thuy Nguyen – Bac Song Cam 2 |
|
|
|
|
|
5 |
Connection of 110 kV side of 220 kV Do Son substation to 110 kV line of Duong Kinh – Do Son |
|
300 |
4 |
1 |
Connected to 2 circuits of 110 kV line of Duong Kinh – Do Son |
|
|
|
|
|
6 |
Connection of 110 kV side of 220 kV Do Son substation to 110 kV line of Duong Kinh – Do Son Industrial Park |
|
300 |
2 |
2.4 |
Connect the 110 kV substation of Do Son Industrial Park to 1 circuit of the line of 220 kV Do Son substation – Do son |
|
|
|
|
|
7 |
Connection of 110 kV side of 220 kV Do Son substation to 110 kV line which supplies power for 110 KV substations of Doi Rong Resort and Van Huong |
|
300 |
2 |
1.6 |
Remove the 110 kV substations of Doi Rong and Van Huong from the 110 kV line of Duong Kinh – Do Son |
|
|
|
|
|
8 |
Branch at 110 kV substation of Ngu Phuc Industrial Park |
|
300 |
2 |
7.2 |
Connected to 1 circuit of 110 kV line of 220 kV An Lao substation - An Lao 2 |
|
|
|
|
|
9 |
Branch at 110 kV substation of Nam Trang Cat Industrial Park |
|
300 |
2 |
1.5 |
Connected to 1 circuit of 110 kV line of Duong Kinh – Do Son Industrial Park |
|
|
|
|
|
10 |
Branch at 110 kV Tan Thanh substation |
|
300 |
2 |
1 |
Connected to 1 circuit of 110 kV line of Duong Kinh – Do Son Industrial Park |
|
|
|
|
|
11 |
Branch at 110 kV substation of Doi Rong Resort |
|
300 |
2 |
1 |
Connected to 1 circuit of 110 kV line of Do Son – Van huong |
|
|
|
|
|
12 |
Branch at 110 kV Doan Xa substation |
|
300 |
2 |
3 |
Connected to 1 circuit of 110 kV line of Duong Kinh – Do Son |
|
|
|
|
|
13 |
Branch at 110 kV substation of Trang Due Mr. Industrial Park |
|
300 |
2 |
0.5 |
Connected to 1 circuit of 110 kV line of 220 kV An Lao substation – LG Display |
|
|
|
|
|
14 |
Branch at 110 kV substation of Tien Thanh Industrial Park |
|
300 |
2 |
4.5 |
Connected to 1 circuit of 110 kV line of An Lao – Tien Lang |
|
|
|
|
|
15 |
Connection of 110 kV side of 220 kV Tien Lang substation to 110 kV line of Tien Lang – Tien Thang |
|
300 |
4 |
4.7 |
Connected to 2 circuits of 110 kV line of Tien Lang – Tien Thang |
|
|
|
|
|
16 |
Connection of 110 kV side of 220 kV Tien Lang substation to 110 kV line of Vinh Bao – Tam Cuong |
|
300 |
4 |
4.5 |
Connected to 2 circuits of 110 kV line of Vinh Bao – Tam Cuong |
|
|
|
|
|
17 |
Connection of 110 kV side of 220 kV Tien Lang substation to 110 kV branch of Vinh Bao – Thai Binh Cuong |
|
300 |
2 |
10 |
Remove at 110 kV branch of Vinh Bao – Thai Binh from the line of 220 kV An Lao substation – Vinh Bao |
|
|
|
|
|
18 |
Branch at 110 kV substation of Vinh Quang Shipyard |
|
300 |
2 |
5.6 |
Connected to 1 circuit of 110 kV line of the 220 kV Tien Lang substation – Tien Thang |
|
|
|
|
|
19 |
Branch at 110 kV substation of An Hoa Industrial Park |
|
300 |
2 |
0.5 |
Connected to 1 circuit of 110 kV line of the 220 kV Tien Lang substation – Thai Binh |
|
|
|
|
|
20 |
Branch at 110 kV substation of Giang Bien II Industrial Park |
|
300 |
2 |
1.5 |
Connected to 1 circuit of 110 kV line of 220 kV An Lao substation – Vinh Bao |
|
|
|
|
|
21 |
Branch at 110 kV substation of Vin 1 Industrial Park |
|
400 |
2 |
5 |
Connected to 1 circuit of 110 kV line of 220 kV Cat Hai – Lach Huyen Port |
|
|
|
|
|
22 |
220 kV Cat Hai substation - Vin 2 Industrial Park |
|
400 |
2 |
5 |
|
|
|
|
|
|
II |
2031-2035 |
|
|
|
|
|
|
|
|
|
|
A |
220 kV lines |
|
|
|
|
|
|
|
|
|
|
B |
110 kV lines |
|
|
|
|
|
|
|
|
|
|
|
New construction |
|
|
|
38.2 |
|
|
|
|
|
|
1 |
220 kV Dai Ban substation – Dai Ban |
|
300 |
2 |
5.8 |
Connected to 1 circuit of 110 kV line of 220 kV Vat Cach substation – Dai Ban |
|
|
|
|
|
2 |
Branch at 110 kV Nam Son substation |
|
300 |
4 |
1 |
Connected to 2 circuits of 110 kV line of Nomura – An Duong Industrial Park |
|
|
|
|
|
3 |
Branch at 110 kV Nomura 2 substation |
|
300 |
2 |
0.4 |
Connected to 1 circuit of 110 kV line of 220 kV Vat Cach substation – Dai Ban |
|
|
|
|
|
4 |
Branches at 110 kV Nam Dinh Vu 1-3 substations |
|
400 |
2 |
2 |
Connected to 1 circuit of 110 kV line of Nam Dinh Vu 1 – Cat Hai |
|
|
|
|
|
5 |
Branch at 110 kV substation of Vinh Quang Shipyard |
|
300 |
2 |
1.9 |
Connected to 1 circuit of 110 kV line of the 220 kV Tien Lang substation – Tam Cuong |
|
|
|
|
|
6 |
Branch at 110 kV substation of Vin 3 Industrial Park |
|
400 |
2 |
5 |
Connected to 1 circuit of 110 kV line of 220 kV Cat Hai – Vin 2 Industrial Park |
|
|
|
|
|
7 |
Vin 1 Industrial Park - Vin 3 Industrial Park |
|
400 |
2 |
2 |
|
|
|
|
|
|
|
Renovation, gauge increase |
|
|
|
24 |
|
|
|
|
|
|
1 |
Dong Hoa – Dinh Vu |
240 |
300 |
2 |
8 |
Renovate the sections using AC 240 cables |
|
|
|
|
|
2 |
220 kV Dinh Vu substation - Nam Dinh Vu 1 |
240 |
400 |
2 |
4 |
|
|
|
|
|
Table 3.2. New construction and renovation of 220 kV and 110 kV substations in Hai Phong city during 2026-2035
|
No. |
Substation |
Transformer |
2025 |
2025 |
2026-2030 |
2026-2030 |
2031-2035 |
2031-2035 |
||||||||
|
|
|
|
Capacity |
Voltage |
Capacity |
Voltage |
Capacity |
Voltage |
|
|
|
|||||
|
A |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
220 kV substations |
||||||||
|
|
New construction |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Dai Ban |
T1 |
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
2 |
Do Son |
T1 |
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
3 |
Tien Lang (**) |
T1 |
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
Renovation and upgrade |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Thuy Nguyen |
T1 |
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T3 |
|
|
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
2 |
Dai Ban |
T2 |
|
|
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
3 |
Dong Hoa |
T1 |
250 |
220/110 |
|
|
375 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
T1 |
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
Dinh Vu |
T1 |
250 |
220/110 |
375 (**) |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
250 |
220/110 |
375 (**) |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
5 |
Duong Kinh |
T1 |
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T3 |
|
|
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
6 |
Do Son |
T2 |
|
|
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
7 |
Tien Lang |
T1 |
|
|
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
8 |
Cat Hai |
T1 |
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T3 |
|
|
|
|
250 |
220/110 |
|
|
|
|
|
|
|
|
|
B |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
110 kV substations |
||||||||
|
I |
New construction |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Thuy Nguyen 2 Industrial Park (VSIP) |
T1 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
2 |
Nui Deo |
T1 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
3 |
Ky Son |
T1 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
4 |
Nam Trang Cat Industrial Park |
T1 |
|
|
40 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
40 |
110/22 |
|
|
|
|
|
|
|
|
|
5 |
Tan Thanh |
T1 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
6 |
Doi Rong Resort |
T1 |
|
|
40 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
40 |
110/22 |
|
|
|
|
|
|
|
|
|
7 |
Ngu Phuc Industrial Park |
T1 |
|
|
40 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
40 |
110/22 |
|
|
|
|
|
|
|
|
|
8 |
Doan Xa |
T1 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
9 |
Expanded Trang Due Industrial Park |
T1 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
10 |
Tien Thanh Industrial Park |
T1 |
|
|
40 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
40 |
110/22 |
|
|
|
|
|
|
|
|
|
11 |
Vinh Quang Shipyard |
T1 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
12 |
Giang Bien II Industrial Park |
T1 |
|
|
40 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
13 |
An Hoa Industrial Park |
T1 |
|
|
25 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
25 |
110/22 |
|
|
|
|
|
|
|
|
|
14 |
Vin 1 Industrial Park |
T1 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
15 |
Vin 2 Industrial Park |
T1 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
16 |
Nomura 2 Industrial Park |
T1 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
17 |
Nam Son |
T1 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
18 |
Nam Dinh Vu 1-3 |
T1 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
19 |
Vinh Quang Industrial Park |
T1 |
|
|
|
|
25 |
110/22 |
|
|
|
|
|
|
|
|
|
20 |
Vin 3 Industrial Park |
T1 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
II |
Renovation and upgrade |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Nam Cau Kien |
T1 |
16 |
110/6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
40 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T3 |
|
|
|
|
40 |
110/22 |
|
|
|
|
|
|
|
|
|
2 |
Bac Song Cam 1 (VSIP) |
T1 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
3 |
Ben Rung |
T1 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
4 |
Hai Phong Thermal Power Plant 3&4 |
T1 |
50 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
50 |
110/22 |
|
|
|
|
|
|
|
|
|
5 |
VAT Cach (connected at 220 kV) |
T1 |
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
6 |
Cuu Long |
T1 |
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
7 |
Dai Ban |
T1 |
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
8 |
An Duong Industrial Park |
T1 |
40 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
40 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
9 |
An Duong |
T1 |
40 |
110/35/22 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
40 |
110/35/22 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
10 |
Ha Ly |
T1 |
25 |
110/22 |
40 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
11 |
Cau Rao |
T1 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
12 |
Lach Tray |
T1 |
40 |
110/22 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
13 |
Ho Dong |
T1 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
14 |
Trang Cat |
T1 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
15 |
Nam Dinh Vu 2 |
T1 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
16 |
Nam Dinh Vu 1-2 |
T1 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
17 |
Duong Kinh (connected at 220 kV) |
T1 |
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
18 |
Do Son |
T1 |
40 |
110/35/22 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
40 |
110/35/22 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
19 |
Van Huong |
T1 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
20 |
Can Cuu Industrial Park |
T1 |
25 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
25 |
110/22 |
|
|
|
|
|
|
|
|
|
21 |
An Lao 2 |
T1 |
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
22 |
Tien Thang |
T1 |
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
23 |
Vinh Bao |
T1 |
40 |
110/35/(22)10 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
T2 |
63 |
110/35/(22)10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
24 |
Tam Cuong |
T1 |
40 |
110/35/22 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
40 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
25 |
Cat Hai 1 |
T1 |
40 |
110/35/22 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
26 |
Dong Bai |
T1 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T3 |
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
27 |
Cat Ba |
T1 |
63 |
110/35/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
25 |
110/35/22 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
28 |
Lach Huyen Port |
T1 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T3 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
|
29 |
Cat Hai 2 |
T1 |
63 |
110/22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T2 |
|
|
|
|
63 |
110/22 |
|
|
|
|
|
|
|
|
(**) Upgrade of 220 kV Dinh Vu substation and new construction of 220 kV Tien Lang substation will be specified in a Electricity Planning VIII, which will be submitted to the Prime Minister for approval.
APPENDIX 4
LIST OF MEDIUM AND SMALL POWER SOURCES TO BE BUILT BY 2035
|
No. |
Name of representative plant |
Location |
Capacity (MW) |
Initiation year |
Connection voltage (kV) |
|
1 |
DEEP C solar power plant |
Dinh Vu Industrial Park |
10 |
2019-2021 |
22 |
|
2 |
DEEP C wind power plant |
Nam Dinh Vu 2 Industrial Park |
20 |
2019-2020 |
22 |
|
3 |
Solar power 1 |
Dinh Vu Industrial Park |
5 |
2021-2025 |
22 |
|
4 |
Solar power 2 |
VSIP Hai Phong Industrial Park |
20 |
2021-2025 |
22 |
|
5 |
Solar power 3 |
Nam Cau Kien Industrial Park |
10 |
2021-2025 |
22 |
|
6 |
Tran Duong Waste-to-energy Plant |
Vinh Bao district |
5 |
2021-2025 |
22 |
|
7 |
Gia Minh Waste-to-energy Plant |
Gia Minh Solid Waste Complex, Thuy Nguyen district |
3 |
2021-2025 |
22 |
|
8 |
Trang Cat Waste-to-energy Plant |
Trang Cat Solid Waste Complex, Hai An district |
2 |
2021-2025 |
22 |
APPENDIX 5
LIST OF DIAGRAMS AND MAPS ENCLOSED WITH APPROVED ELECTRICITY PLANNING OF HAI PHONG CITY
|
No. |
Name |
Symbol |
|
1 |
Map of 220 – 110 kV grids of Hai Phong city by 2035 |
D864-HP-01 |
|
2 |
Diagram of 220 – 110 kV grids of Hai Phong city by 2035 |
D864-HP-02 |
|
3 |
Diagram of MV ouputs connected to 110 kV substations in Hai Phong city by 2025 |
D864-HP-03 |
---------------
This document is handled by Vinas Doc. Document reference purposes only. Any comments, please send to email: [email protected]